Case studies

Public Sector case studies

Projects we've delivered for public sector clients.

Case studies

Public Sector projects

Public SectorPoint-to-point wireless

Gentoo

Sunderland · Completed 2019

The challenge
Ofcom told Gentoo, which manages more than 29,000 homes in Sunderland, that the frequency used by its 11-link wireless network was being reassigned to 5G. Without an upgrade it faced a substantial fine.
What we did
Redesigned the whole network and chose licensed and unlicensed point-to-point technology link by link, based on line of sight, distance and bandwidth.
Result
12 new wireless links delivering up to 2.5Gbps, now carrying door entry, fire alarms and other systems on one network. We have continued to upgrade and extend the network since.

KBR provided us with the perfect point-to-point solution. The reliability of our systems greatly improved, and the level of service and professionalism has been second to none. We’d certainly recommend KBR to any large organization in need of better connectivity.

Systems Support Engineer, Gentoo
Public SectorStructured cabling and fibre

The Gateshead Housing Company

Gateshead · Completed 2019

The challenge
After a data link failed, the housing company needed a competent cabling contractor. KBR was appointed through its procurement framework, with risk assessments and method statements that met every point on its checklist.
What we did
Tested the faulty cable and installed a multimode OM3 fibre link between the ground-floor and loft cabinets, using Enhanced DBS-certified engineers with minimal disruption.
Result
The fault was fixed, and KBR has since become the company's go-to supplier for installing, commissioning and testing data networks.

The service that KBR provide is second to none. They provide very competitive quotes for work, they provide CDM 2015 information very quickly when requested and they arrive on site and complete the work when they say they will.

Assistant Project Manager, The Gateshead Housing Company
Customer feedback

What our customers say

The summer holiday window is always an intense, non-negotiable delivery period, but KBR delivered across multiple school sites flawlessly. Every single project was completed on schedule, cleanly installed, and to the exceptionally high standard we’ve come to rely on from their team. Working with an infrastructure partner that understands the pressures of the education sector and consistently gets it right first time is invaluable. Fantastic work from the entire KBR team.
South Tyneside CouncilSimon Brown